Nursery Extension, Lincolnshire 

Dynamic delivering nursery extension within limited construction space. 

Dynamic continue to support our partners success within the education sector 

 
Speed: Fast track installation with our structure completed in days 
Reduced disruption: Limited deliveries within a live school without impacting on the daily operation of the school 
Innovation: hybrid structure to achieve open span 
Precision: Design and manufactured to create seamless extension to existing building 
 

Building System - Hybrid System 

Floor: steel cassettes / External walls: SIPs / Roof: metal web cassettes