Construction progresses on stunning dynamic structure
Posted on 11th November 2020 at 10:11
The construction works are progressing with our stunning rooftop structure for a specialist learning space at a Bedfordshire school.
Working with a contractor and leading education sector consultancy the Dynamic team have recently handed over this stunning structure for a new STEM (Science, Technology, Engineering and Maths) centre of excellence hub.
This building will provide an additional 1000 m2 of learning space comprising of 7 much-needed specialist teaching spaces and a lecture hall.
“This project truly showcases the benefits of our continued investment in modern methods of construction. The ability to control the design, manufacture and installation smoothed the delivery of a demanding structure on a live school site, working over existing buildings and the challenges of Covid-19” Gavin Wilkes, Director.
If you would like more information on the Dynamic Offsite approach please call 0121 724 0099 or email info@dynamicoffsite.co.uk
Share this post: